$207 946,00

Budget for the project action

Renovation of the infectious diseases section of the Rezina District Hospital

Localities:

  • Level: Local
  • Region: North
  • District: Rezina
  • Locality: Rezina

Contributing partners:

$207 946,88

SDG
SDG

Focus Areas:

  • Capacity development
  • Confidence building
  • Health

Target groups:

  • Local authorities
  • Population

Timeline:

Start date End date
01 Dec 2015 01 Jul 2016

Results:

  • Renovation of the entire infectious diseases section of the hospital. The roof was replaced, thermally insulated and the entire façade was renovated. Windows and doors were replaced with new ones
  • A ventilation system was established. Heating, water, electricity and sewerage systems were all renovated. Every room was equipped with a separate closet, shower cabin and sinks
  • The space where the food is distributed was totally renovated. All public areas and patient rooms in the building were renovated and are complying with respective safety and sanitary norms

Beneficiaries:

  • 42,000 (population of Rezina)
0