$192 754,00

Budget for the project action

Reconstruction of General Education School/Kinder Garden nr. 2 in Nezavertailovca village (left bank)

Localities:

  • Level: Local
  • Region: Transnistrian region
  • District: Slobozia
  • Locality: Nezavertailovca

Contributing partners:

$192 754,00

SDG
SDG

Focus Areas:

  • Capacity development
  • Confidence building
  • Education & sports

Target groups:

  • Local authorities
  • Population

Timeline:

Start date End date
01 Nov 2015 01 Aug 2016

Results:

  • Full renovation of the auxiliary block that hosts a concert hall . The auxiliary block was consolidated according to current safety norms
  • The roof was changed and thermally insulated; all electrical and heating networks were replaced
  • New restrooms were built inside the facility. A cesspool was built and now the facility has a functional sewerage system
  • In the main block, the thermal system was completely renovated. In addition, the sports hall was renovated and equipped

Beneficiaries:

  • 746 (225 children+71 staff+450 parents): 395 women and 351 men
0